Transition from Steel-Post MGS to Thrie-Beam Approach Guardrail

System 1: MGS W-Beam Guardrail
System 2: Thrie-Beam Guardrail
Test Specification: AASHTO MASH 2016
Test Level: TL-3
Curb No
Rubrail No
Manufacturer: Non-Proprietary
Contact: Ronald K. Faller, P.E., Ph.D.
Drawing Status: Review Complete
FHWA Eligibility Letter: B-231




DrawingsOther DocumentsImagesComponentsArchive
    No files found.
  • No files found.
External Links for Additional Information
None


All content is provided for informational purposes only. The Task Force 13 Guide to Standardized Roadside Hardware and its contents do not constitute a standard, specification, or regulation.